All Contracts Throughout Dunedin On Track!
Another excellent month for our team!
Work is progressing well in Sawyers Bay and all the private property drainage has been completed.
Carr Street Foul Sewer and Stormwater Renewals also moving forward at a good pace.
The team has installed a 1200mm diameter manhole up to 3.5m deep ready for the FS pipe and are now working on the excavation and shoring for the 1800mm diameter manhole, which will be a connection point for the 825mm concrete pipes starting next week.
The boys in at the Retail Quarter had their watermain and connections pass first time this week, so another good month for them.
The slip repairs contract has also kicked off this week, with Rock Control Ltd clearing the vegetation and analysing the extent of the slip.
Thanks to the boys for all the efforts, we’re looking forward to another productive month!
Pro Civil. Good people, great results!