We are currently working through the bad weather and poor ground make up in Sawyers Bay.
Due to the current conditions we are installing an 800mm stabilised soft raft which is wrapped in bidim cloth and providing a solid base for our bedding and pipe.
We are also battling a high ground water table with a couple pumps, well points and sediment tanks. The tanks have to be cleared daily and taken away to an approved contaminated dump site along with all the fill being removed.
Thanks to the team for pushing on in tough conditions and getting the job done regardless.